Up-front cost estimating of change orders

Osama Moselhi, Ihab Assem, Khaled El-Rayes

Research output: Contribution to journalConference articlepeer-review

Abstract

The development of a automated system, for up-front equitable estimation of productivity losses arising from change orders, is discussed. A prototype software system which incorporates the developed model and four regression models was presented for estimating productivity losses arising from changing orders. The analysis shows the accuracy and useful features of the developed software.

Original languageEnglish (US)
Pages (from-to)CDR151-CDR156
JournalAACE International. Transactions of the Annual Meeting
StatePublished - Jan 1 2002
Externally publishedYes
Event46th Annual Meeting of AACE International - Portland, OR, United States
Duration: Jun 23 2002Jun 26 2002