T1 - Towards the construction of a class of grid operational flexibility metrics
AU - Abrantes, A. L.
AU - Gross, G.
N1 - Publisher Copyright:
© 2020
Copyright:
Copyright 2020 Elsevier B.V., All rights reserved.
PY - 2021/1
Y1 - 2021/1
N2 - The increased net load uncertainty and variability due to higher levels of renewable energy resource integration into grids require the clear understanding and quantification of grid operational flexibility (GOF) and associated impacts. However, there is no widely-accepted methodology to assess flexibility, guide policy formulation and quantify the value of operational flexibility. Recent efforts towards improved flexibility assessment have focused on feasible net load ramps, operational margins and robustness bounds. In this paper, we propose an approach to GOF assessment focused on the economic impacts related to net load variability/uncertainty accommodation. We illustrate the application of the proposed approach through representative study cases on a modified version of the IEEE Reliability Test System operated under a multi-settlement system. Our results indicate that the market outcomes provide a concrete basis for GOF assessment in general, and in particular, the impacts due to ramping limitations provide insights into a grid's ability to accommodate net load variability/uncertainty.
AB - The increased net load uncertainty and variability due to higher levels of renewable energy resource integration into grids require the clear understanding and quantification of grid operational flexibility (GOF) and associated impacts. However, there is no widely-accepted methodology to assess flexibility, guide policy formulation and quantify the value of operational flexibility. Recent efforts towards improved flexibility assessment have focused on feasible net load ramps, operational margins and robustness bounds. In this paper, we propose an approach to GOF assessment focused on the economic impacts related to net load variability/uncertainty accommodation. We illustrate the application of the proposed approach through representative study cases on a modified version of the IEEE Reliability Test System operated under a multi-settlement system. Our results indicate that the market outcomes provide a concrete basis for GOF assessment in general, and in particular, the impacts due to ramping limitations provide insights into a grid's ability to accommodate net load variability/uncertainty.
KW - Electricity market and grid operations
KW - Grid operational flexibility
KW - Renewable energy integration impacts
UR - http://www.scopus.com/inward/record.url?scp=85089075334&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85089075334&partnerID=8YFLogxK
U2 - 10.1016/j.epsr.2020.106674
DO - 10.1016/j.epsr.2020.106674
M3 - Article
AN - SCOPUS:85089075334
VL - 190
JO - Electric Power Systems Research
JF - Electric Power Systems Research
SN - 0378-7796
M1 - 106674
ER -