Abstract

To evaluate the estimated annual production cost and the reliability of a given power system, it is desired to divide the problem into three subproblems: probabilistic simulation, maintenance scheduling, and hydro scheduling. The formulation and solution method for each of these three problems are presented in this paper.

Original languageEnglish (US)
Pages (from-to)877-899
Number of pages23
JournalProceedings - IEEE International Symposium on Circuits and Systems
StatePublished - 1977
Externally publishedYes
EventProc IEEE Int Symp Circuits Syst - Phoenix, AZ, USA
Duration: Apr 25 1977Apr 27 1977