PROBABILISTIC SIMULATION OF POWER SYSTEM OPERATION FOR PRODUCTION COST AND RELIABILITY EVALUATION.

Felix F. Wu, George Gross

Research output: Contribution to journalConference article

Abstract

To evaluate the estimated annual production cost and the reliability of a given power system, it is desired to divide the problem into three subproblems: probabilistic simulation, maintenance scheduling, and hydro scheduling. The formulation and solution method for each of these three problems are presented in this paper.

Original languageEnglish (US)
Pages (from-to)877-899
Number of pages23
JournalProceedings - IEEE International Symposium on Circuits and Systems
StatePublished - Jan 1 2017
EventProc IEEE Int Symp Circuits Syst - Phoenix, AZ, USA
Duration: Apr 25 1977Apr 27 1977

Fingerprint

Scheduling
Costs

ASJC Scopus subject areas

  • Electrical and Electronic Engineering

Cite this

@article{fc499008b5e14b08b872466a596e386c,
title = "PROBABILISTIC SIMULATION OF POWER SYSTEM OPERATION FOR PRODUCTION COST AND RELIABILITY EVALUATION.",
abstract = "To evaluate the estimated annual production cost and the reliability of a given power system, it is desired to divide the problem into three subproblems: probabilistic simulation, maintenance scheduling, and hydro scheduling. The formulation and solution method for each of these three problems are presented in this paper.",
author = "Wu, {Felix F.} and George Gross",
year = "2017",
month = "1",
day = "1",
language = "English (US)",
pages = "877--899",
journal = "Proceedings - IEEE International Symposium on Circuits and Systems",
issn = "0271-4310",
publisher = "Institute of Electrical and Electronics Engineers Inc.",

}

TY - JOUR

T1 - PROBABILISTIC SIMULATION OF POWER SYSTEM OPERATION FOR PRODUCTION COST AND RELIABILITY EVALUATION.

AU - Wu, Felix F.

AU - Gross, George

PY - 2017/1/1

Y1 - 2017/1/1

N2 - To evaluate the estimated annual production cost and the reliability of a given power system, it is desired to divide the problem into three subproblems: probabilistic simulation, maintenance scheduling, and hydro scheduling. The formulation and solution method for each of these three problems are presented in this paper.

AB - To evaluate the estimated annual production cost and the reliability of a given power system, it is desired to divide the problem into three subproblems: probabilistic simulation, maintenance scheduling, and hydro scheduling. The formulation and solution method for each of these three problems are presented in this paper.

UR - http://www.scopus.com/inward/record.url?scp=0017787829&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0017787829&partnerID=8YFLogxK

M3 - Conference article

AN - SCOPUS:0017787829

SP - 877

EP - 899

JO - Proceedings - IEEE International Symposium on Circuits and Systems

JF - Proceedings - IEEE International Symposium on Circuits and Systems

SN - 0271-4310

ER -