Abstract
To evaluate the estimated annual production cost and the reliability of a given power system, it is desired to divide the problem into three subproblems: probabilistic simulation, maintenance scheduling, and hydro scheduling. The formulation and solution method for each of these three problems are presented in this paper.
Original language | English (US) |
---|---|
Pages (from-to) | 877-899 |
Number of pages | 23 |
Journal | Proceedings - IEEE International Symposium on Circuits and Systems |
State | Published - 1977 |
Externally published | Yes |
Event | Proc IEEE Int Symp Circuits Syst - Phoenix, AZ, USA Duration: Apr 25 1977 → Apr 27 1977 |
ASJC Scopus subject areas
- Electrical and Electronic Engineering