PROBABILISTIC SIMULATION OF POWER SYSTEM OPERATION FOR PRODUCTION COST AND RELIABILITY EVALUATION.

Felix F. Wu, George Gross

Research output: Contribution to journalConference article

Abstract

To evaluate the estimated annual production cost and the reliability of a given power system, it is desired to divide the problem into three subproblems: probabilistic simulation, maintenance scheduling, and hydro scheduling. The formulation and solution method for each of these three problems are presented in this paper.