Prefabricated vertical-drain test section in Craney Island Dredged Material Management Area

Timothy D. Stark, Thomas A. Williamson, Jack Fowler, David Pezza, Yvonne Gibbons

Research output: Contribution to journalArticlepeer-review

Abstract

A 183 m by 122 m prefabricated vertical-drain test section was completed in February, 1993, in the Craney Island Dredged Material Management Area. The test section was constructed to evaluate the effectiveness of prefabricated vertical drains in consolidating the dredged fill and underlying foundation clay, thus increasing the storage capacity of the facility. The feasibility of installing prefabricated vertical drains was questionable because vertical drains had never been installed in an active dredged material management area; a drain length of approximately 50 m was close to the longest vertical drain ever installed, and the installation equipment could exert a ground pressure of only 10.3 kPa to operate on the surface of the soft dredged material. Results show that the dredged fill and foundation clay underwent substantial consolidation settlement (1.8 to 2.7 m in 30 months) after drain installation. In summary, prefabricated vertical drains appear to be an economical technique for increasing the storage capacity of active and inactive dredged material management areas.

Original languageEnglish (US)
Pages (from-to)8-16
Number of pages9
JournalJournal of Performance of Constructed Facilities
Volume13
Issue number1
DOIs
StatePublished - Feb 1999

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction
  • Safety, Risk, Reliability and Quality

Fingerprint

Dive into the research topics of 'Prefabricated vertical-drain test section in Craney Island Dredged Material Management Area'. Together they form a unique fingerprint.

Cite this