PGANDE'S STATE-OF-THE-ART SCHEDULING TOOL FOR HYDRO SYSTEMS.

Yoshiro Ikura, George Gross, Gene Sand Hall

Research output: Contribution to journalArticlepeer-review

Abstract

A hydro-scheduling system, HYSS, was developed for the Pacific Gas and Electric Company to produce optimal release policies for each of the 86 hydropower plants in the 23 river-basin hydroelectric system. HYSS has become the basic tool used to operate the utility's complex hydro-generation system efficiently. The use of HYSS has helped increase production of hydropower, resulting in a reduction of revenues required from ratepayers of an estimated 10 million to 45 million each year. The improved schedules for hydropower result directly in better resource planning throughout the company.

Original languageEnglish (US)
Pages (from-to)65-82
Number of pages18
JournalInterfaces
Volume16
Issue number1
DOIs
StatePublished - 1986
Externally publishedYes

ASJC Scopus subject areas

  • Strategy and Management
  • Management Science and Operations Research
  • Management of Technology and Innovation

Fingerprint

Dive into the research topics of 'PGANDE'S STATE-OF-THE-ART SCHEDULING TOOL FOR HYDRO SYSTEMS.'. Together they form a unique fingerprint.

Cite this