Optimum planning of highway construction under A + B bidding method

Research output: Contribution to journalArticle

Abstract

In recent years, many departments of transportation in the United States have started to apply the A + B bidding method in highway projects in order to reduce construction time and minimize its associated traffic congestion and adverse impact on local economies. The application of this method places an increased pressure on contractors to minimize both the time and cost of highway construction. This paper presents a practical model for optimizing resource utilization in highway projects that utilize the A + B bidding method. The model is designed to minimize the total combined bid by identifying the optimum crew formation and the optimum level of crew work continuity for each activity in the project. The model is developed using a dynamic programming formulation and is incorporated in a Windows application that provides a user-friendly interface to facilitate the optimization analysis. An application example of a highway project is analyzed to illustrate the use of the model and to demonstrate its capabilities.

Original languageEnglish (US)
Pages (from-to)261-269
Number of pages9
JournalJournal of Construction Engineering and Management
Volume127
Issue number4
DOIs
StatePublished - Jul 1 2001

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction
  • Industrial relations
  • Strategy and Management

Fingerprint Dive into the research topics of 'Optimum planning of highway construction under A + B bidding method'. Together they form a unique fingerprint.

  • Cite this