Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty

Abbas Hassan, Khaled El-Rayes, Mohamed Attalla

Research output: Contribution to journalArticlepeer-review

Abstract

Purpose: This paper presents the development of a novel model for optimizing the scheduling of crew deployments in repetitive construction projects while considering uncertainty in crew production rates. Design/methodology/approach: The model computations are performed in two modules: (1) simulation module that integrates Monte Carlo simulation and a resource-driven scheduling technique to calculate the earliest crew deployment dates for all activities that fully comply with crew work continuity while considering uncertainty; and (2) optimization module that utilizes genetic algorithms to search for and identify optimal crew deployment plans that provide optimal trade-offs between project duration and crew deployment plan cost. Findings: A real-life example of street renovation is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the stochastic scheduling of crew deployments in repetitive construction projects. Originality/value: The original contribution of this research is creating a novel multiobjective stochastic scheduling optimization model for both serial and nonserial repetitive construction projects that is capable of identifying an optimal crew deployment plan that simultaneously minimizes project duration and crew deployment cost.

Original languageEnglish (US)
Pages (from-to)1615-1634
Number of pages20
JournalEngineering, Construction and Architectural Management
Volume28
Issue number6
DOIs
StatePublished - 2020

Keywords

  • Construction management
  • Crew deployment date
  • Genetic algorithms
  • Linear scheduling
  • Monte Carlo simulation
  • Optimization
  • Repetitive construction projects
  • Stochastic models

ASJC Scopus subject areas

  • General Business, Management and Accounting
  • Building and Construction
  • Architecture
  • Civil and Structural Engineering

Fingerprint

Dive into the research topics of 'Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty'. Together they form a unique fingerprint.

Cite this