Optimizing resource utilization for repetitive construction projects

Khaled El-Rayes, Osama Moselhi

Research output: Contribution to journalArticlepeer-review

Abstract

Optimizing resource utilization can lead to significant reduction in the duration and cost of repetitive construction projects such as highways, high-rise buildings, and housing projects. This can be achieved by identifying an optimum crew size and interruption strategy for each activity in the project. Available dynamic programming formulations can be applied to provide solutions for this optimization problem; however, their application is limited, as they require planners to specify an arbitrary and an unbounded set of interruption options prior to scheduling. Such a requirement is not practical and may render the optimization problem infeasible. To circumvent the limitations of available formulations, this paper presents an automated and p'ractical optimization model. The model utilizes dynamic programming formulation and incorporates a scheduling algorithm and an interruption algorithm so as to automate the generation of interruptions during scheduling. This transforms the consideration of interruption options, in optimizing resource utilization, from an unbounded and impractical problem to a bounded and feasible one. A numerical example from the literature is analyzed to illustrate the use and capabilities of the model.

Original languageEnglish (US)
Pages (from-to)18-26
Number of pages9
JournalJournal of Construction Engineering and Management
Volume127
Issue number1
DOIs
StatePublished - 2001

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Building and Construction
  • Industrial relations
  • Strategy and Management

Fingerprint

Dive into the research topics of 'Optimizing resource utilization for repetitive construction projects'. Together they form a unique fingerprint.

Cite this