Abstract
When managing a project with uncertain completion time and unobservable contractor's work rate, self-interest can create conflicts between the project manager and the contractor leading to actions that reduce the profits of both. We first investigate how the concept of supply contract coordination (i.e., a Nash equilibrium that yields the first-best solution for the entire supply chain) can be applied to project contract management. In our examination of three types of project contracts commonly used in practice, fixed price, time-based (i.e., price depends on the realized project completion time), and cost-based (i.e., price depends on the actual cost), we show that fixed price contracts and cost-plus contracts cannot coordinate a channel. With carefully chosen parameters, however, time-based, cost-sharing can achieve optimal channel coordination.
Original language | English (US) |
---|---|
Pages (from-to) | 247-254 |
Number of pages | 8 |
Journal | International Journal of Production Economics |
Volume | 126 |
Issue number | 2 |
DOIs | |
State | Published - Aug 2010 |
Keywords
- Channel coordination
- Project contracts
- Supply contracts
ASJC Scopus subject areas
- Business, Management and Accounting(all)
- Economics and Econometrics
- Management Science and Operations Research
- Industrial and Manufacturing Engineering