TY - GEN
T1 - Optimal storage scheduling for minimizing schedule deviations considering variability of generated wind power
AU - Dutta, S.
AU - Overbye, T. J.
PY - 2011
Y1 - 2011
N2 - Incorporation of energy storage units with wind farms is being considered critical for wind farms to address variability in wind power generation and meeting committed generation schedules. However, operational constraints such as limited energy of storage units, in addition to the inherent variability of wind power, limit the maximum generation commitment that can be met reliably by a wind farm operating in combination with a storage plant. This paper presents a method for computing an optimal storage dispatch for a storage unit coupled with a wind farm over the period of one hour with the objective of minimizing generation schedule deviations and taking into consideration the uncertainties involved in wind power predictions. The optimization uses a stochastic dynamic programming framework in discrete time. The algorithm minimizes the total expected deviations from a steady power delivery schedule of the combined wind farm-energy storage plant. Tests on a simplified model of a wind-storage plant connected to a load verify the desired objectives. The deviations when generated wind power is known accurately are also presented as a special case. Results provide insights about the maximum generation commitment the combined wind-storage unit can meet without deviations over the scheduling horizon given the probabilities of power generation from wind.
AB - Incorporation of energy storage units with wind farms is being considered critical for wind farms to address variability in wind power generation and meeting committed generation schedules. However, operational constraints such as limited energy of storage units, in addition to the inherent variability of wind power, limit the maximum generation commitment that can be met reliably by a wind farm operating in combination with a storage plant. This paper presents a method for computing an optimal storage dispatch for a storage unit coupled with a wind farm over the period of one hour with the objective of minimizing generation schedule deviations and taking into consideration the uncertainties involved in wind power predictions. The optimization uses a stochastic dynamic programming framework in discrete time. The algorithm minimizes the total expected deviations from a steady power delivery schedule of the combined wind farm-energy storage plant. Tests on a simplified model of a wind-storage plant connected to a load verify the desired objectives. The deviations when generated wind power is known accurately are also presented as a special case. Results provide insights about the maximum generation commitment the combined wind-storage unit can meet without deviations over the scheduling horizon given the probabilities of power generation from wind.
KW - coordination of energy storage with wind
KW - generation schedule
KW - probability distribution of wind power
KW - schedule deviation
KW - stochastic dynamic programming
KW - storage optimization
UR - http://www.scopus.com/inward/record.url?scp=79958857340&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=79958857340&partnerID=8YFLogxK
U2 - 10.1109/PSCE.2011.5772521
DO - 10.1109/PSCE.2011.5772521
M3 - Conference contribution
AN - SCOPUS:79958857340
SN - 9781612847870
T3 - 2011 IEEE/PES Power Systems Conference and Exposition, PSCE 2011
BT - 2011 IEEE/PES Power Systems Conference and Exposition, PSCE 2011
T2 - 2011 IEEE/PES Power Systems Conference and Exposition, PSCE 2011
Y2 - 20 March 2011 through 23 March 2011
ER -