Keyphrases
Construction Projects
100%
Prefabricated Module
100%
Minimizing Transportation Cost
100%
Planners
75%
Storage Cost
75%
Modular Construction
75%
Total Transportation Cost
50%
Decision Variables
25%
Model Support
25%
Model Performance
25%
Design Methodology
25%
Non-overlapping
25%
Rectangular Shape
25%
Cost-effectiveness
25%
Irregular Shape
25%
Weight Distribution
25%
Mixed Integer Programming
25%
Construction Site
25%
Storage Area
25%
Optimization Model
25%
Original Contributions
25%
Construction Cost
25%
Model Optimization
25%
Healthcare Facilities
25%
Optimization Computation
25%
Feasible Set
25%
Relevant Decisions
25%
Storage Modelling
25%
Truck Assignment
25%
Module Arrangement
25%
Hybrid Modular Construction
25%
Aerodynamic Drag Reduction
25%
Engineering
Modular Construction
100%
Storage Cost
75%
Limitations
25%
Objective Function
25%
Construction Site
25%
Decision Variable
25%
Storage Area
25%
Irregular Shape
25%
Feasible Set
25%
Prefabricated Construction
25%
Aerodynamic Drag Reduction
25%
Earth and Planetary Sciences
Drag Reduction
100%
Aerodynamic Drag
100%
Prefabricated Building
100%
Medicine and Dentistry
Health Care Cost
100%
Cost-Effectiveness Analysis
25%