Skip to main navigation
Skip to search
Skip to main content
Illinois Experts Home
LOGIN & Help
Home
Profiles
Research units
Research & Scholarship
Datasets
Honors
Press/Media
Activities
Search by expertise, name or affiliation
Integration of just-in-time production and material handling for an assembly environment
Muhammad F. Anwar,
Rakesh Nagi
Research output
:
Contribution to conference
›
Paper
›
peer-review
Overview
Fingerprint
Fingerprint
Dive into the research topics of 'Integration of just-in-time production and material handling for an assembly environment'. Together they form a unique fingerprint.
Sort by
Weight
Alphabetically
Keyphrases
Material Handling
100%
Just-in-time Production
100%
Makespan
50%
Inventory Holding Cost
50%
Material Inventory
50%
Manufacturing Environment
25%
Complex Assembly
25%
Backlog
25%
Due Date
25%
Integrated Problem
25%
Production Schedule
25%
Integrated Scheduling
25%
Production Strategy
25%
Operational Network
25%
Handling Operations
25%
Material Handling Equipment
25%
JIT Production
25%
Engineering
Production Time
100%
Material Handling
100%
Assembly Environment
100%
Inventory Holding Cost
40%
Design and Environment
20%
Lead Time
20%
Handling Equipment
20%
Critical Path
20%
Production Strategy
20%