Integrating the lot-sizing and sequencing decisions for scheduling a capacitated flow line

Riyaz Sikora, Dilip Chhajed, Michael J. Shaw

Research output: Contribution to journalArticle

Abstract

In this paper we consider a general problem of scheduling a single flow line consisting of multiple machines and producing a given set of jobs. The manufacturing environment is characterized by sequence dependent set-up times, limited intermediate buffer space, and capacity constraints. In addition, jobs are assigned with due dates that have to be met. The objectives of the scheduling are: (1) to meet the due dates without violating the capacity constraints, (2) to minimize the makespan, and (3) to minimize the inventory holding costs. While most of the approaches in the literature treat the problem of scheduling in flow lines as two independent sub-problems of lot-sizing and sequencing, our approach integrates the lot-sizing and sequencing heuristics. The integrated approach uses the Silver-Meal heuristic (modified to include lot-splitting) for lot-sizing and an improvement procedure applied to Palmer's heuristic for sequencing, which takes into account the actual sequence dependent set-up times and the limited intermedite buffer capacity. We evaluate the performance of the integrated approach and demonstrate its efficacy for scheduling a real world SMT manufacturing environment.

Original languageEnglish (US)
Pages (from-to)659-679
Number of pages21
JournalComputers and Industrial Engineering
Volume30
Issue number4
DOIs
StatePublished - Sep 1996

ASJC Scopus subject areas

  • Computer Science(all)
  • Engineering(all)

Fingerprint Dive into the research topics of 'Integrating the lot-sizing and sequencing decisions for scheduling a capacitated flow line'. Together they form a unique fingerprint.

  • Cite this