Comment on a pre-run-time scheduling algorithm for hard real-time systems

Tarek F. Abdelzaher, Kang G. Shin

Research output: Contribution to journalArticlepeer-review

Abstract

In Shepard and Gagne [1], a branch-and-bound implicit enumeration algorithm is described whose purpose is to generate a feasible schedule, if any, for each processor on a multiprocessing node running hard real-time processes. The optimization criterion is to minimize process lateness defined as the difference between the process completion time and deadline. We show in this correspondence that this algorithm does not always succeed in finding a feasible solution, and describe the reason why the algorithm might fail.

Original languageEnglish (US)
Pages (from-to)599-600
Number of pages2
JournalIEEE Transactions on Software Engineering
Volume23
Issue number9
DOIs
StatePublished - 1997
Externally publishedYes

Keywords

  • Branch and bound scheduling algorithm
  • Hard real-time systems
  • Multiprocessors
  • Pre-run-time scheduling
  • Precedence constraints

ASJC Scopus subject areas

  • Software

Fingerprint

Dive into the research topics of 'Comment on a pre-run-time scheduling algorithm for hard real-time systems'. Together they form a unique fingerprint.

Cite this