If you made any changes in Pure these will be visible here soon.

Research Output

Filter
Article

A Discourse on the Incorporation of Organizational Factors into Probabilistic Risk Assessment: Key Questions and Categorical Review

Pence, J. & Mohaghegh, Z., Jun 1 2020, In : Risk Analysis. 40, 6, p. 1183-1211 29 p.

Research output: Contribution to journalArticle

An algorithm for enhancing spatiotemporal resolution of probabilistic risk assessment to address emergent safety concerns in nuclear power plants

Bui, H., Sakurahara, T., Pence, J., Reihani, S., Kee, E. & Mohaghegh, Z., May 2019, In : Reliability Engineering and System Safety. 185, p. 405-428 24 p.

Research output: Contribution to journalArticle

An integrated methodology for spatio-temporal incorporation of underlying failure mechanisms into fire probabilistic risk assessment of nuclear power plants

Sakurahara, T., Mohaghegh, Z., Reihani, S., Kee, E., Brandyberry, M. & Rodgers, S., Jan 2018, In : Reliability Engineering and System Safety. 169, p. 242-257 16 p.

Research output: Contribution to journalArticle

Data-theoretic approach for socio-technical risk analysis: Text mining licensee event reports of U.S. nuclear power plants

Pence, J., Farshadmanesh, P., Kim, J., Blake, C. & Mohaghegh, Z., Apr 2020, In : Safety Science. 124, 104574.

Research output: Contribution to journalArticle

Data-theoretic methodology and computational platform to quantify organizational factors in socio-technical risk analysis

Pence, J., Sakurahara, T., Zhu, X., Mohaghegh, Z., Ertem, M., Ostroff, C. & Kee, E., May 2019, In : Reliability Engineering and System Safety. 185, p. 240-260 21 p.

Research output: Contribution to journalArticle

GIS-Based Integration of Social Vulnerability and Level 3 Probabilistic Risk Assessment to Advance Emergency Preparedness, Planning, and Response for Severe Nuclear Power Plant Accidents

Pence, J., Miller, I., Sakurahara, T., Whitacre, J., Reihani, S., Kee, E. & Mohaghegh, Z., Jun 2019, In : Risk Analysis. 39, 6, p. 1262-1280 19 p.

Research output: Contribution to journalArticle

Global importance measure methodology for integrated probabilistic risk assessment

Sakurahara, T., Reihani, S., Kee, E. & Mohaghegh, Z., Apr 1 2020, In : Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability. 234, 2, p. 377-396 20 p.

Research output: Contribution to journalArticle

Integrated Risk-Informed Design (I-RID) methodological framework and computational application for FLEX equipment storage buildings of Nuclear Power Plants

Schumock, G., Zhang, S., Farshadmanesh, P., Owens, J. G., Kasza, N., Stearns, J., Sakurahara, T. & Mohaghegh, Z., Feb 2020, In : Progress in Nuclear Energy. 120, 103186.

Research output: Contribution to journalArticle

Integrating renewal process modeling with Probabilistic Physics-of-Failure: Application to Loss of Coolant Accident (LOCA) frequency estimations in nuclear power plants

Sakurahara, T., O'Shea, N., Cheng, W. C., Zhang, S., Reihani, S., Kee, E. & Mohaghegh, Z., Oct 2019, In : Reliability Engineering and System Safety. 190, 106479.

Research output: Contribution to journalArticle

Measurement techniques for organizational safety causal models: Characterization and suggestions for enhancements

Mohaghegh, Z. & Mosleh, A., Dec 1 2009, In : Safety Science. 47, 10, p. 1398-1409 12 p.

Research output: Contribution to journalArticle

Methodological and Practical Comparison of Integrated Probabilistic Risk Assessment (I-PRA) with the Existing Fire PRA of Nuclear Power Plants

Sakurahara, T., Mohaghegh, Z., Reihani, S. & Kee, E., Dec 2 2018, In : Nuclear Technology. 204, 3, p. 354-377 24 p.

Research output: Contribution to journalArticle

Methodology to evaluate the monetary benefit of Probabilistic Risk Assessment by modeling the net value of Risk-Informed Applications at nuclear power plants

Pence, J., Abolhelm, M., Mohaghegh, Z., Reihani, S., Ertem, M. & Kee, E., Jul 2018, In : Reliability Engineering and System Safety. 175, p. 171-182 12 p.

Research output: Contribution to journalArticle

RoverD: Use of test data in GSI-191 risk assessment

Kee, E., Hasenbein, J., Zolan, A., Grissom, P., Reihani, S., Mohaghegh, Z., Yilmaz, F., Letellier, B., Moiseytseva, V., Vaghetto, R., Imbaratto, D. & Sakurahara, T., Nov 2016, In : Nuclear Technology. 196, 2, p. 270-291 22 p.

Research output: Contribution to journalArticle

SHAKE-RoverD Framework for Nuclear Power Plants: A Streamlined Approach for Seismic Risk Assessment

Farshadmanesh, P., Sakurahara, T., Reihani, S., Kee, E. & Mohaghegh, Z., Mar 4 2019, In : Nuclear Technology. 205, 3, p. 442-463 22 p.

Research output: Contribution to journalArticle

Simulation-Informed Probabilistic Methodology for Common Cause Failure Analysis

Sakurahara, T., Schumock, G., Reihani, S., Kee, E. & Mohaghegh, Z., May 2019, In : Reliability Engineering and System Safety. 185, p. 84-99 16 p.

Research output: Contribution to journalArticle