If you made any changes in Pure these will be visible here soon.

Research Output

Filter
Paper
2011

A dynamic programming approach for nation building problems

Tauer, G., Nagi, R. & Sudit, M., Jan 1 2011.

Research output: Contribution to conferencePaper

2010

Material handling delivery in the presence of varying speed and interruptions

Zhang, M., Batta, R. & Nagi, R., Jan 1 2010.

Research output: Contribution to conferencePaper

Situation assessment: Uncertainty representation in inexact graph matching

Gross, G., Nagi, R. & Sambhoos, K., Jan 1 2010.

Research output: Contribution to conferencePaper

2006

Workflow congestion in a facility layout

Min, Z., Batta, R. & Nagi, R., Dec 1 2006.

Research output: Contribution to conferencePaper

2004

Adaptive data mining in a variant design support system

Romanowski, C. J. & Nagi, R., Dec 1 2004. 1 p.

Research output: Contribution to conferencePaper

Contour line construction for a new rectangular facility in an existing layout with rectangular departments

Kelachankuttu, H., Batta, R. & Nagi, R., Dec 1 2004. 1 p.

Research output: Contribution to conferencePaper

Scheduling to minimize stringer utilization in metal indu

Nagi, R., Mujawar, S., Huang, S. & Patel, D., Dec 1 2004. 1 p.

Research output: Contribution to conferencePaper

The planar area location/layout problem

Sarkar, A., Batta, R. & Nagi, R., Dec 1 2004, p. 1-6. 6 p.

Research output: Contribution to conferencePaper

2003

Assembly variant design methodology

Wang, A. & Nagi, R., Jan 1 2003, p. 443-450. 8 p.

Research output: Contribution to conferencePaper

Rapidly re-configurable mold manufacturing of free-form objects

Kelkar, A., Koc, B. & Nagi, R., Jan 1 2003, p. 355-362. 8 p.

Research output: Contribution to conferencePaper

1997

Integrated conflict free routing of AGVs and workcenter scheduling in a just-in-time production environment

Anwar, M. F. & Nagi, R., Dec 1 1997, p. 216-221. 6 p.

Research output: Contribution to conferencePaper

Integrated material flow and layout in facilities design

Kane, M. C. & Nagi, R., Dec 1 1997, p. 919-924. 6 p.

Research output: Contribution to conferencePaper

Object hierarchy scheme for complex assemblies to aid information retrieval and work process database integration

Ramabhatta, V., Lin, L. & Nagi, R., Dec 1 1997, p. 650-655. 6 p.

Research output: Contribution to conferencePaper

Single facility layout with existing machines as barriers

Savas, S., Batta, R. & Nagi, R., Dec 1 1997, p. 925-929. 5 p.

Research output: Contribution to conferencePaper

1996

Integrated information framework for agile manufacturing

Song, L. & Nagi, R., Dec 1 1996, p. 568-573. 6 p.

Research output: Contribution to conferencePaper

Integration of just-in-time production and material handling for an assembly environment

Anwar, M. F. & Nagi, R., Dec 1 1996, p. 281-286. 6 p.

Research output: Contribution to conferencePaper

1995

Flexible optimization framework for partner selection in agile manufacturing

Gupta, P. & Nagi, R., Dec 1 1995, p. 691-700. 10 p.

Research output: Contribution to conferencePaper

Identification and ranking of similar parts in agile manufacturing

Iyer, S. & Nagi, R., Dec 1 1995, p. 709-717. 9 p.

Research output: Contribution to conferencePaper

1994

Identification of similar parts in agile manufacturing

Iyer, S. & Nagi, R., Dec 1 1994, p. 87-96. 10 p.

Research output: Contribution to conferencePaper